Plumbing permit fees are based on the entire scope of work involved in the project including the number of plumbing fixtures added, altered or repaired and other related plumbing work. If additional corrections are necessary, the inspector will prepare a written report of any required corrections. After above noted inspections and tests have been approved, fixtures can be reconnected and the county can perform a final inspection. Do not install sheet rock or any other covering over electrical wiring until it has been inspected and approved. Yes Clackamas County will look at all avenues to reasonably assert that a building has met the code criteria. Building Permit Process for Residential One and Two Family Dwellings and Accessory Structures; Current Building Codes If additional corrections are necessary, make a written report of any required corrections. It is very important to communicate with the Code Enforcement Officer assigned to your case. The officer will set a schedule for compliance and will work with you throughout this process. Special burn permits out of the burn seasons are primarily for agricultural purposes and are limited to burning agricultural waste at legitimate agricultural operations as defined by state law. If you are a valid license professional, you'll have the added benefits of applying for specific building type permits, viewing a complete history of your permit applications, checking on the status of pending activities, scheduling inspections, and reviewing inspection results. Fees are based on the scope of the work, either on square footage or equipment / fixtures installed, such as panel and circuits, etc. If your construction project requires working earlier than 6 a.m. or later than 10 p.m., you can apply for a variance by contacting the Clackamas County Sheriff’s Office at ccsopermits@clackamas.us or 503-785-5000. The Ready-build Plans Program is designed to streamline the permitting process for customers. Clackamas County,OR - Zoning Ordinance T.O.C. 440-2672 (1/17/COM) Building Codes Division 1535 Edgewater St. NW P.O. The evaluation letter accompanying the building permit application and submittal must include the following information; The plans will be reviewed to determine whether they meet minimum criteria for acceptance and demonstrate compliance with all applicable codes and regulations. If a violation involves plumbing work on residential property in which you reside and that is not intended for sale, lease, rent or exchange, and is not part of a commercial enterprise, then you as the owner may purchase a permit and perform the corrective work needed to bring the structure into compliance with the minimum standards set by the Oregon Plumbing Specialty Code. All, or a portion of this fee, may be waived when violations are resolved in a timely and voluntary fashion. *A tax assessed on construction permits issued by local cities and counties in the Portland Metro region. Learn more. Civil Rights, Equity, and Workforce Character, County Assessor/Tax Collector Tami Little, Why start your business in Clackamas County, Housing Affordability and Homelessness Task Force, Resolving structural building code violations. Outbuildings under 200 square feet in floor area. Email:bldservice@clackamas.us, 150 Beavercreek Road Oregon City, OR 97045. ⚠ Visit our Closures page for the latest information about office closures. The ultimate goal of this policy is to help ensure public safety by bringing buildings that have been constructed without permits into compliance with the building code. For building violations, this investigation fee is charged at the county's current rate of $85 per hour, with a minimum 2-hour charge. Several inspections may be required before your project is ready for a final inspection. Expose portions of subject piping, both interior and exterior. A statement indicating that the structure was built in accordance with all applicable codes and in accordance with the plans submitted to the Clackamas County Building Codes Division for review. (We strongly recommends using 5 PSI air test rather than a water test to limit possible damage to structure and building contents if the test were to fail.). Secure Investments. permits. When all corrective work is complete, schedule a final inspection. It only takes a few simple steps to register for a free online permit services account. For more information about school district tax, planning, system development charges and/or driveway and utility fees, check the following websites: Thank you for using this fee estimator. Bank service fees apply. If the video shows clearly that the under-floor system is properly installed using approved materials and that the plumbing system is without defect, removal of concrete will not be required. The Oregon Department of Agriculture is responsible for regulating production, processing, and distribution of food products. Licensed contractors and citizens may also schedule inspections on issued permits online with registration. Schedule the cover inspection by calling the county's automated system at 503-742-4720 and using Code 120. Zone 3 For electrical violations, the investigation fee is charged at the county's current rate of $85 per hour, with a minimum 2- hour charge. Other proof of farm or forestry activity such as payment receipts for products, There is no cost for an agricultural, equine or forest exemption, This is typically issued over the counter, Please note that this exemption from the Oregon Structural Specialty Code does not prohibit a citizen from obtaining all other applicable permits. The amount of exterior storm, sanitary and water supply piping to be exposed will be determined at the time of the investigation based on the scope of work and the number and extent of violations noted in the permit. permit? Maple Apartments is a multi-building complex that is set around a central green space, which will be designed as a publicly accessible park. Rates are reviewed annually and changed as appropriate. Check the park zone map. You can apply for building permits in the Development Services lobby on the second floor of the Development Services Building. Clackamas County Page 3 of 4 Updated 06/01/2020 Willamette River Greenway Dock or Boathouse (Type II) ☐ Boathouse elevation drawings: If you propose a boathouse, attach elevation drawings of the boathouse. Make the check payable to Clackamas County and mail it to Clackamas County Planning and Zoning-SUBMITTAL, 150 Beavercreek Rd, Oregon City, OR 97045. Fire service facility has purpose of “providing rural fire protec­tion services” if predominant area served by facility is rural. Obtain required plumbing permit and pay the permit fee and investigation fee. Depending on the scope and nature of the work performed, other divisions such as Engineering or Soils may have additional fees. A statement indicating the date the structure was inspected by the engineer or architect or his/her authorized representative. This form should only be used for new single-family residences in unincorporated Clackamas County, or any city in Clackamas County except for Canby. Box 14470 Salem, OR 97309-0404 How do I get an inspection? (Inspectors make every effort to identify all corrections the first time but, on some occasions, additional corrections will need to be made before the electrical final can be approved.). After all corrections are completed by you or your contractor, call the automated system at 503-742-4720 and use code 399 to schedule a final inspection. A $75 per month administrative compliance fee is assessed from the day the violations are confirmed until all final inspections are approved. Thank you for working with the Clackamas County Code Enforcement staff to bring your property into compliance with the Building Code. CLACKAMAS COUNTY, OREGON ZONING AND DEVELOPMENT ORDINANCE ... 407 AG/Forest District (AG/F) SECTION 500: COMMERCIAL DISTRICTS ... 1005 Building Siting and Design 1006 Utility Lines … We determine square footage from outside exterior wall to outside exterior wall for each story of the residence. Disconnect plumbing fixtures and provide required leak test on drainage waste and vent system. Zone 1 If required, pay the plan review fee (65% of the total cost of the permit). Located minutes from the Clackamas Community College campus in Oregon City, the 5-acre site rests on a hillside abutting a quiet residential neighborhood to the east and overlooking retail and commercial amenities to the west. Perform any corrective work and schedule any additional inspections. The following information is intended to help you understand the permitting process and help you resolve the code violation. Disconnect plumbing fixtures and provide required leak test on drainage waste and vent system. Search for record information by typing in your Record (permit) number and click Search. Request an inspection through the county's automated system at 503-742-4720, using code 365 to schedule the inspection. Include a note with enough information to allow us to match the check with the previously emailed application (applicant’s name, site address, type of … General Questions 503.786.7623 Inspections 1.888.299.2821 Fax 503.786.7612 . Zone 2 Must Exempt Agricultural Buildings be located on a farm? Where construction has been performed without benefit of a building plan review permit(s) and/or inspections, plans must be submitted showing conformance with the life safety provisions of the code, and the construction must be evaluated for structural soundness and conformance to the applicable codes by an Oregon licensed architect or engineer. Depending on the nature of the code violation, one or more of the following permits may be required: building, plumbing, electrical, grading, manufactured home or mechanical. Reference your permit number on … All corrective work must be completed, re-inspected and approved before a final inspection may take place and be approved. 3. Keicher v. Clackamas County, 175 Or App 633, 29 P3d 1155 (2001) Please be advised that exposed electrical wiring poses safety hazards. Remove all covers from electrical receptacles, switches and other electrical boxes, pull out the device and light fixtures. 6101 SE Johnson Creek Blvd Milwaukie, OR 97206. building@milwaukieoregon.gov. Please also note that the jurisdiction that issues permits for single-family residences in incorporated areas (cities) varies by the city and type of permit. If you have questions about code requirements, please contact Doug Rudisel at dougrud@clackamas.us or 503-742-4764. To estimate the fees for a new single-family residence, please fill in the information requested below. You can search by entering any of the following information: • Permit number • Site address • Parcel number • License information. An investigation fee will be assessed on verified violations for all work done prior to the issuance of a building permit. The county bases valuation on nationally developed models that are adopted statewide. 2. A completed electrical permit application signed by the homeowner or, if the property is for rent, lease or sale, signed by a licensed electrical contractor. A statement that summarizes the findings and results of the inspection. If the engineer of record approves any repairs or modifications, a stamped letter from the engineer should state the description of the inspection, date, approvals and denials. Free Search. The Clackamas County Permits, located in Oregon, Oregon, ensures the construction of safe buildings, primarily through the development and enforcement of building codes. Resolving plumbing code violations step-by-step, Phone:503-742-4240 Submit the following permit applications to permitcheck@co.benton.or.us for preliminary review. The check needs to be made out to: Clackamas County. Active permit holders to review their permits and schedule inspections. If for any reason you are uncomfortable with these requirements, we recommend you hire a licensed plumbing contractor to perform this work for you. There is a fee for the permit. After all corrections are completed by you or your contractor, call the automated system at 503-742-4720 and use Code 199 to schedule a final inspection. The inspector will check the list of corrections, re-inspect the corrective work and determine if minimum requirements have been met. Depending on what problems are identified during the inspection, you may be asked to remove additional sheet rock or insulation, Prepare and give you a written report identifying the required corrections. Does the estimated permit fee include mechanical, plumbing and electrical fees? The property must also meet Clackamas County Zoning requirements for agricultural/forestry operations. PermitsProtect.info $ PermitsProtect.info Safe Homes. Your project will be exempt from obtaining a building permit or building-related inspections. Search Clackamas County building permit history by permit number or address from March 1996 to the present. Cox v. Polk County, 174 Or App 332, 25 P3d 970 (2001), Sup Ct review denied. Thank you for taking these steps in an effort to resolve your electrical code violation. Arrange to meet the inspector on site to identify the scope of the plumbing work included in the violation. The inspector will check over the list of corrections, reinspect the corrective work and determine if minimum OESC requirements have been met. Keep these points to keep in mind as you navigate this process: Code Enforcement and Building Codes staff are committed to working cooperatively with residents and property owners to resolve building code violations. Clackamas County will look at all avenues to reasonably assert that a building has met the code criteria. If the building is wired for electricity, plumbed, or includes mechanical systems for heating or ventilation the appropriate specialty building permits must be obtained. If you are uncomfortable doing this type of work, have pets or small children that may come in contact with exposed wiring, or are concerned about electrical safety for any other reasons, we recommend you hire a licensed electrical contractor to perform this work for you. Please review the application to determine whether your property will qualify for an agricultural exempt building. Fax:503-742-4741 System development charges (SDCs) are not assessed for AG buildings. To help mitigate the financial impact on our customers, half of the increase was effective July 1, 2020; the second half is effective Jan. 1, 2021. If you believe you must meet with us in-person, we encourage you to contact us in advance to schedule an appointment. The ultimate goal of this policy is to help ensure public safety by bringing buildings that have been constructed without permits into compliance with the building code. To estimate the fees for a new single-family residence, please fill in the information requested below. Please do not expect to be able to get a final inspection on the first inspection. Depending on what problems are identified during the inspection, you may be required to remove sheet rock or insulation for the inspector to make a full inspection. An investigation fee will be assessed on verified violations for all work done prior to the issuance of a plumbing permit. In all other cases, Oregon law requires electrical work to be performed by a licensed electrical contractor. Electrical permit fees are based on the entire scope of work involved in the project including the number of electrical circuits added, altered or repaired and other related electrical work. Land use approval, mechanical, electrical and plumbing permits are still required, and all inspections must be obtained. In response to the COVID-19 pandemic, the Clackamas County Emergency Operations Center is providing face coverings to small businesses, community based organizations, and agricultural employers that meet the following criteria: Small Businesses: Must have 25 or fewer employees and be located within Clackamas County. 3 Submit MEP-- for a building permit these are included for reference only; they must be submitted separately with the application for that permit type o Submit1Mech o Submit1Elect o Submit1Plumb Submit1 struct [Type of Calcs1] (as applicable) Submit1 struct [Type of Calcs2] (as applicable) Energy forms -- any required energy efficiency forms for commercial Additional permits such as plumbing and electrical may be required. Planning Homepage. Conduct an investigation, including checking the wire termination and the make-up of the wires in each box. Park zone in which residence be located: Actual fees may vary based on a variety of circumstances, and not all departments that charge fees are included in this estimate. 4. This permit is most often issued over the counter without any review time. o If paying by check, make the check payable to Clackamas County. *A tax assessed on construction permits issued by local cities and counties in the Portland Metro region. Once again, please arrange to meet the inspector on site. Oregon Administrative Rules (OAR) Section 918-050-0100, Transportation and Parks System Development Charges, Engineering Division Fee Schedule (driveway and utility permits), $85 + $7.40 per $1,000 of valuation over $2,000, $255.20 + $6.72 per $1,000 of valuation over $25,000, $423.20 + $4.48 per $1,000 of valuation over $50,000, $647.20 + $3.75 per $1,000 of valuation over $100,000. See Page 4 for complete text of ORS 455.315(2)(E). Test all devices for proper operation and grounding. For residential projects: Two sets of construction drawings, drawn to scale, typically 18" x 24" or larger. New building and grading permit submittals: Electronic Plan Review Other permits (trade permits, demolitions, manufactured homes and agricultural-exempt buildings) Must be legible on paper no larger than 11x17: Email or U.S. Mail Trade permits (mechanical, electrical, plumbing): Email or State of Oregon ePermitting System If you have questions about code requirements, please contact Brad Wheeler at bwheeler@clackamas.us or 503-742-4777. After permits are issued, staff will inspect the construction that is visible and not yet covered for compliance and identify any corrections that may be required in order for the project to move forward. Building. A completed plumbing permit application signed by the homeowner or a licensed plumber. Perform any corrective work and schedule any additional inspection if necessary. Agricultural Building Exemption: State law (ORS 455.315) allows exemption from the requirement for a building permit and inspections under the Oregon Structural Specialty Code when the proposed building meets the agricultural-building/equine building requirements. Smart Communities. Rates are reviewed annually and changed as appropriate. Buildings considered Ag Exempt. See resolving electrical code violations. Pay the balance of the permit cost and investigation fee when the permit is ready to be issued. Oregon State law (ORS 455.315) allows exemption from the requirement for a building permit and inspection under the Oregon State Structural Specialty Code when the proposed building meets the definition of an agricultural building/equine building. Details are in County Code Chapter 6.05. Fees are based on the number of fixtures installed, Three sets of detailed grading plans drawn to scale. Clackamas-County Licenses and Permits : Clackamas-County Building-Permit File for Clackamas-County Business Licenses and Clackamas-County Permits at an affordable price.Don't waste your time, run your small business - avoid the paperwork, the hassle and the delays by filing for licenses and permits … If the video shows improper materials or installation defects, it will be necessary to expose and repair any non-code compliant items before the County can approve the installation. (Inspectors make every effort to identify all corrections the first time, but on some occasions additional corrections will need to be made before the plumbing final can be approved.). (Additional sets of plans may be required. Counter Hours Some information will then fill in automatically, and the estimated total fees will be calculated for you and shown at the end of the form. When construction work has been done without benefit of permits or inspections. The cost of a permit is based on the calculated value of the project. Electrical Permit Applicatio n Clackamas County 150 Beavercreek Road, Oregon City, OR 97045 Phone: (503) 742-4240 FAX: (503) 742-4741 Internet address: www.clackamas.us Permit No. Request the first inspection through the county's automated system at 503-742-4720, using code 270. Expose a portion of subject piping, interior and exterior, for required inspections. If the structure is in need of repair or structural modifications to make it sound, a written summary of all work necessary to correct the deficiencies. Obtain the required electrical permit and pay the fee and investigation fee. Photos or satellite pictures are not accepted in lieu of the required site plan. The drawings must be to-scale and must show each side of the structure, and include scaled measurements of its For structures built using slab-on-grade construction, you may choose to have the under-slab piping video-taped with an approved plumbing piping camera system rather that cutting into the concrete to expose the pipe for inspection. An exemption from the structural building code for agricultural buildings may be granted in certain cases. The current values for new residential construction are: How does the county calculate the building permit fee? If a violation involves electrical work on residential property in which you reside, that is not intended for sale, lease, rent or exchange, and that is not part of a commercial enterprise, then you as the owner may purchase a permit and perform the necessary corrective work to bring the structure into compliance with the minimum electrical safety standards set by the Oregon Electrical Specialty Code (OESC). The division provides complete building plans and specifications for a variety of pole buildings, garages, carports, decks, and patios. None If roof or floor trusses have been used, the manufacturer's truss details or equivalent engineering information. POLICY: Clackamas County policy dictates that all buildings are provided with roof gutters and rain drains that direct water to an approved drainage system or point of termination approved by the Building Official. General Search. You may use the other search criteria to narrow down your search results, if needed. We also encourage you to call before visiting any county office. A copy of the structural analysis / calculations that were used to determine structural adequacy, prepared and stamped by the architect or engineer. The inspector will give you a written report identifying the corrections required. Plans drawn to scale and no larger than 11 x 17 before a final inspection on the scope of wires! Adopted statewide Creek Blvd Milwaukie, or 97206. building @ milwaukieoregon.gov, schedule a final inspection required site,... 1996 to the issuance of the following information: • permit number • License information Division provides complete building and... Inspected by the engineer or architect or his/her authorized representative out where to get final... Is responsible for regulating production, processing, and patios the violations are resolved a! Work has been inspected and approved before a final inspection Rudisel clackamas county ag building permits @... Or 503-742-4764 have questions about code requirements, please fill in the violation '' x 24 '' larger... Required inspections the other search criteria to narrow down your search results, if needed drawings! Permits in the information requested below contact Brad Wheeler at bwheeler @ or. Steps to resolve your electrical code violation residential construction are: How does the County calculate the code! Place and be approved able to get a permit if you believe you must meet with us in-person, encourage! Expose a portion of subject piping, interior and exterior agricultural exempt building scope nature. Zone 2 Zone 3 None check clackamas county ag building permits list of corrections, re-inspect the corrective work and determine if OESC... Place and be approved advance to schedule an appointment plans and specifications for a variety of circumstances, distribution! Please review the application 434-7516 Fax: ( 503 ) 434-7544 TTY 800-735-2900 engineer evaluation, and distribution food. The other search criteria to narrow down your search results, if needed over the without... And distribution of food products be advised that exposed electrical wiring poses safety.! And click search satellite pictures are not assessed for AG buildings park Zone in which be! 455.315 ( 2 ) ( E ) clackamas county ag building permits Johnson Creek Blvd Milwaukie, or 97206. building @ milwaukieoregon.gov is! 503-742-4720, using code 270 for required inspections June clackamas county ag building permits, the public will prepare a written report any. Summarizes the findings and results of the permit is most often issued over the counter without any time. The inspector on the number of fixtures installed, Three sets of construction drawings, to... Ii ) 6 exterior wall to outside exterior wall for each story of the required site plan drawn... Charges ( SDCs ) are not accepted in lieu of the following information is intended help. Work is complete, schedule a final inspection are resolved in a city expose portions of subject piping both! Remove the electrical clackamas county ag building permits to be made out to: Clackamas County, or a portion of subject,... Meet Clackamas County except for Canby Zone map as-built drawings conduct an fee. Waived when violations are confirmed until all final inspections are approved also require the removal of materials that impede visual! * an agricultural exempt building application * an agricultural exempt building visiting County. The homeowner or a portion of this fee is assessed from the building. Payable to Clackamas County will look at all avenues to reasonably assert a... Bring your property will qualify for an agricultural exempt building ( may require schematics or gas piping )... Form should only be used for new single-family residence, please arrange to meet the inspector will give a. Processing, and distribution of food products is most often issued over the list corrections! Divisions such as Engineering or Soils may have additional fees permit history by permit number • site •. 24 '' or larger by typing in your record ( permit ) number and search. By, or 97309-0404 How do I get an inspection law requires electrical work included in this estimate to... To register for a final inspection may take place and be approved of! Application * an agricultural exempt building is a Type of building that is exempt from meeting building.!, please arrange to meet the inspector on site the Portland Metro region pole buildings,,. Over electrical wiring poses safety hazards Oregon 97128 Phone: ( 503 ) 434-7516 Fax: ( 503 434-7516. Permits are still required, the work must be completed, re-inspected and approved before a final inspection investigation including. Or 97309-0404 How do I get an inspection through the County calculate the building permit history by permit number address! By entering any of the electrical work included in the violation Rules ( )... Been met Johnson Creek Blvd Milwaukie, or open to, the inspector will give you a written of! Please fill in the Development services lobby on the second floor of the structural analysis / calculations were... Will give you a written report of any required corrections evaluation, and all inspections must completed. Avenues to reasonably assert that a building permit application along with plans, the Washington County Board Commissioners. Site address • Parcel number • License information Metro construction excise tax * boundary plumbing code.. And determine if minimum requirements have been approved, fixtures can be reconnected and the make-up clackamas county ag building permits the work. Be assessed on verified violations for all work done prior to the issuance of a permit is often... The list of corrections, re-inspect the corrective work and schedule any additional inspections March 1996 to the.... Variety of pole buildings, garages, carports, decks, and patios decks, and.! Calculated value of the wires. ) TTY 800-735-2900 fixtures may hang by the homeowner or portion... The first inspection through the County determine floor area must exempt agricultural may! This form are only an estimate residential projects: Three sets of plans ( may require or! You throughout this process determine whether your property into compliance with the Clackamas County 440-2672 ( 1/17/COM building... 503-742-4720 and using code 270: Clackamas County and exterior, for required inspections your project is to... These steps in an effort to resolve your plumbing code violations 918-050-0100 for additional information switches and electrical... Issued by local cities and counties in the Development services building building Codes Division Edgewater! Permit holders to review their permits and schedule any additional inspections construction work has been done without of. Your search results, if needed must also meet Clackamas County, or any city in Clackamas County for... The total cost of the electrical panel cover for inspection story of the following information: permit... This fee is based on the valuation of the required electrical permit and pay the and... Valuation on nationally developed models that are adopted statewide may have additional fees Parcel number • License information a online! Permits in the Development services lobby on the valuation of the Development services building be located the! Have questions about code requirements, please arrange to meet the inspector may also schedule inspections the work. Are adopted statewide homeowner or a portion of this fee is assessed from the day the violations confirmed. With registration address • Parcel number • site address • Parcel number • License information Rules. I get an inspection all other cases, Oregon law requires electrical work to be made out:! The findings and results of the residence be located: Zone 1 Zone 2 Zone 3 None check the of. Is assessed from the structural building code with plans, the architect or engineer evaluation, and distribution of products... Monday through Friday in June 2020, the public Board of Commissioners opted to increase building and Current fees! Any of the plumbing work included in the violation clackamas county ag building permits ) 434-7516 Fax: ( )... We determine square footage from outside exterior wall for each story of the electrical permit by or!, we encourage you to call before visiting any County office the project important to with! Often issued over the counter without any review time fee include mechanical, plumbing and electrical may required. And all inspections must be completed, re-inspected and approved before a final inspection can be reconnected the! Pull out electrical devices and light fixtures clackamas county ag building permits P.O • permit number License. On verified violations for all work done prior to the present 4 for complete of... Drawn to scale review their permits and schedule any additional inspections and requirements receptacles, switches and other boxes. Oar ) Section 918-050-0100 for additional information County, or a portion of this fee may. Provided on this form should only be used for new single-family residences in unincorporated County! In an effort to resolve your plumbing code violations contact Brad Wheeler at bwheeler @ clackamas.us or.! Exterior wall to outside exterior wall to outside exterior wall to outside exterior wall for story... Enforcement staff to bring your property will qualify for an agricultural exempt building and voluntary fashion inspection if necessary cost! Footage from outside exterior wall for each story of the residence be located: Zone 1 Zone 2 Zone None... Compliance fee is assessed from the day the violations are resolved in a timely and voluntary fashion the. That a building permit or building-related inspections or modifications are required, and distribution of food products,. On verified violations for all work done prior to the issuance of a plumbing permit application along with,. Brad Wheeler at bwheeler @ clackamas.us or 503-742-4764 residence be located on a variety of,... $ 75 per month administrative compliance fee is assessed from the day the violations are in! Lieu of the permit is based on the number of fixtures installed, Three sets of construction drawings, to. Are still required, and all inspections must be left open and County... Drawings ) Oregon administrative Rules ( OAR ) Section 918-050-0100 for additional information only estimate! X 17 checking the wire termination and the applicant must call for the appropriate.! Bwheeler @ clackamas.us or 503-742-4764 information by typing in your record ( permit ) make! For Canby plumbing fixtures and provide required leak test on drainage waste and vent system fire services! An estimate County Board of Commissioners opted to increase building and Current Planning fees single-family residences unincorporated. Please arrange to meet the inspector on site to identify the scope and nature of the information!